3 November 2017 – Winter works at Molesey Lock Postponed to 2018/19

EA advise that the proposed works at Molesey Lock have now been postponed to the 2018/19 winter works programme. The revised programme for 2017/18 can be seen here:

http://www.gov.uk/river-thames-conditions-closures-restrictions-and-lock-closures

This entry was posted in Latest News. Bookmark the permalink.